Weld Inspection & NDT: Visual, MT, PT, UT and What Gets Accepted

Weld Inspection & NDT: Visual, MT, PT, UT and What Gets Accepted

Welcome

Hello, and welcome. This is Super Structures General Contractors — a national general contractor headquartered in Powhatan, Virginia — here to help you and your clients build something that lasts. We're glad you're with us, and we look forward to connecting with you.

Alright, Weld Inspection & NDT: Visual, MT, PT, UT and What Gets Accepted. Don't let the plain title fool you. Here's the part that actually matters on the job: Visual inspection by a qualified inspector against the code's acceptance criteria catches most problems, and NDT such as MT and UT is used where the drawings and the quality plan require it to find what the eye cannot. Learn it well and you will know what the inspector is looking for before the inspector arrives, which is the whole secret to passing.

A weld is accepted or rejected against written criteria, not against an opinion. This lesson covers who inspects, what they check, which nondestructive testing (NDT) methods find what, and what happens when something fails.

Who inspects and under what rules

Two inspection programs run on a structural job. Quality control (QC) belongs to the contractor doing the welding: a QC inspector, usually an AWS Certified Welding Inspector (CWI) qualified under AWS QC1 or an equivalent the code accepts, checks the work as it happens. Quality assurance (QA) belongs to the owner: under IBC Chapter 17 structural steel welding is a special inspection, and AISC 360 Chapter N spells out what the QA special inspector verifies before, during, and after welding, splitting tasks into those the inspector must observe on a sampling basis and those the inspector must perform on every item. NDT technicians qualify separately, typically to ASNT SNT-TC-1A Level II in their method.

Visual inspection is the backbone

Visual testing (VT) is required on all welds under D1.1 and is done in three windows: before welding (WPS matching the joint, welder qualified, fit-up within tolerance, surfaces clean, preheat verified, consumables controlled), during welding (within the WPS ranges, interpass cleaning and temperature, position and technique), and after welding, against the acceptance criteria. The D1.1 criteria for statically loaded structures that a field welder should know:

NDT methods and when each is used

Discontinuity versus defect and what causes each

A discontinuity is any interruption in the weld; it becomes a defect only when it exceeds the acceptance limit. The common ones and their field causes:

Repairs and reinspection

Defects are removed by grinding or gouging to sound metal, never welded over. A crack is removed along with sound metal beyond each end as the code requires, confirmed gone by MT or PT, and then rewelded under a WPS. Repairs are reinspected by the same method that found the defect. Repairs beyond what the code allows or repeated repairs in one location go to the engineer for approval. Every repair is written up on a nonconformance report with location, cause, disposition, and verification. Headed shear studs have their own routine: a pre-production bend test, a check of every stud for a full 360-degree flash, and a 15-degree bend of any stud with flash missing.

Going Deeper (Intermediate)

The inspector cannot see a weld through fireproofing, deck, or drywall. Field crews call for VT before anything covers a weld, and foremen keep a weld map with each welder's stencil beside each joint so UT indications trace to a person and a WPS. On T-joints and corner joints with backing, UT has geometric blind spots; a good technician scans from more than one face and writes the limitations on the report.

Advanced / Pro-Level

Phased-array UT is accepted under D1.1 with a written procedure and qualified technicians and is becoming common on heavy splices because it images the weld rather than reading a single beam. Seismic projects under D1.8 take demand-critical welds to 100 percent UT. Pros also watch for k-area cracking after welding continuity and doubler plates into rolled columns, and the best QC inspectors track reject rates by welder, joint type, and cause, and fix the cause rather than the symptom.

Practice Challenge

A 5/16 in. fillet weld is 30 in. long. The inspector's gauge reads 1/4 in. along 6 in. of it; the rest is full size and otherwise sound. Accept or reject? (Answer: reject. A 5/16 in. weld may be undersize by up to 1/8 in., but only along 10 percent of the length, and 6 in. of 30 is 20 percent. The undersize section is cleaned, another pass is added under the WPS, and the weld is reinspected.)

In Practice

A welder who knows the undercut and porosity limits, carries a gauge, and fixes a cold cap before walking away rarely sees a reject tag. A welder who treats the criteria as a mystery learns them one gouged-out weld at a time.

Common Mistakes to Avoid

Takeaway: Visual inspection by a qualified inspector against the code's acceptance criteria catches most problems, and NDT such as MT and UT is used where the drawings and the quality plan require it to find what the eye cannot.

Educational content only — not engineering, design, inspection, or safety advice, and not a substitute for hands-on training, a qualified welding procedure, or a licensed professional. Weld to the WPS and the drawings, follow AWS D1.1, AISC, and OSHA requirements as adopted and applied on your project, and follow the manufacturer's instructions for your equipment and consumables.