Segmental Retaining Walls: Geogrid, Drainage & When an Engineer Is Required

Segmental Retaining Walls: Geogrid, Drainage & When an Engineer Is Required

Welcome

Hello, and welcome. This is Super Structures General Contractors — a national general contractor headquartered in Powhatan, Virginia — here to help you and your clients build something that lasts. We're glad you're with us, and we look forward to connecting with you.

Alright, Segmental Retaining Walls: Geogrid, Drainage & When an Engineer Is Required. Don't let the plain title fool you. Here's the part that actually matters on the job: A segmental wall is a soil structure — the leveling pad, the buried course, the drainage, the geogrid, and the compacted backfill do the work, and any wall that is tall, tiered, or carrying a surcharge is an engineer's wall, not a crew's guess. Learn it well and your walls stand plumb through the wettest spring, and the engineer's inspection is a formality.

The intro gave you the parts of an SRW. This lesson is about building one the way the design manual and the manufacturer's installation guide assume it will be built, and about recognizing the walls you are not allowed to build without a stamp.

Gravity walls versus reinforced walls

A gravity wall stands on the weight, depth, and setback of the units alone. Each manufacturer publishes a maximum gravity height for each unit, soil type, and slope condition, often only 3 to 4 feet, and sometimes less with a slope above or clay behind. Above that, the wall becomes a reinforced soil structure: layers of geogrid tie the units to a mass of compacted fill that works as one block. The design manual for SRWs from CMHA (formerly NCMA) and the engineer's drawings control the grid type, length, and spacing. The crew's job is to build exactly what is drawn.

Leveling pad and the first course

Excavate a trench to the pad depth plus the buried course. The pad is 6 inches of compacted dense-graded aggregate, about 24 inches wide so it extends 6 inches in front of and behind the block, screeded level. Some commercial designs call for an unreinforced concrete pad. Bury at least one full course, or about 1 inch for every 8 inches of wall height, whichever is more.

The first course is half the wall. Set each unit level front-to-back and side-to-side with a torpedo level, tapped down, tight to its neighbor, and checked against a string line along the front face. A unit an eighth of an inch high in the first course is an inch out by the eighth course. Sweep each course before the next goes on; a pebble under a block kicks the face out. Follow the unit's setback (pins, lips, or a rear lip) consistently so the batter is uniform.

Drainage stone, pipe and filter

Water is what fails walls. Hydrostatic pressure behind a wall with no drainage pushes it over regardless of how well the block was laid. Place at least 12 inches of clean open-graded stone (No. 57) directly behind the units, fill the cores of hollow units with it, and set a 4-inch perforated drain pipe at the base of the stone, sloped to daylight. Outlet the pipe through or around the wall at the low points and at least every 50 feet. Wrap the back of the drainage stone with non-woven geotextile so fines do not migrate into it, and cap the stone with 6 to 8 inches of soil over fabric so surface water sheds rather than soaking down. Grade a swale along the top of the wall to carry runoff away, and never route downspouts, sump discharges, or irrigation into the backfill zone.

Geogrid placement

Uniaxial geogrid has one strong direction, and it runs perpendicular to the wall face, from the block back into the fill. Rolled the wrong way it does almost nothing. Place grid on a level, compacted lift, cut to the length on the drawings, usually a minimum of about 60 to 70 percent of the wall height and never less than 4 feet, laid to within an inch of the front face of the block, with the next course set on top to pin it. Pull it taut toward the backfill and stake it before placing soil, and lay adjacent pieces edge to edge with no gaps along the face. At inside and outside curves, cut pie-shaped pieces and overlap with a layer of fill between overlapping grids.

Backfill behind the drainage stone in lifts no thicker than about 8 inches loose, compacted to the specified density, normally 95 percent standard Proctor. Within 3 feet of the back of the units use hand-operated plate equipment only; a tracked machine or roller that close pushes the wall forward. Keep heavy equipment off bare grid; put the lift down first. Do not mix drainage stone and backfill soil. Do not bring the next course up more than the design allows before the backfill catches up.

When the engineer and the permit come in

The IRC and IBC exemption at 4 feet from the bottom of the footing to the top of the wall is the floor, not the rule. Walls need an engineer, a permit, and usually inspections when any of these is true: taller than 4 feet; carrying a surcharge such as a slope, driveway, pool, structure, or fence posts; tiered, where the upper wall sits closer than about twice the lower wall's height behind it, which makes the upper wall a surcharge on the lower; built on or holding clay, fill, or wet soils; near groundwater or a water source; or holding a walking surface high enough that a guard is required, often 30 inches in many jurisdictions. Local rules are often stricter than the model code. The engineer's package gives the unit, batter, grid type and lengths, drainage, and the inspection points: pad, first course, drainage, each grid layer, and compaction. Build to it, photograph each stage, and keep the compaction reports.

Going Deeper (Intermediate)

Corners use corner units or cut blocks with alternating overlaps so the corner does not unzip. Steps built into a wall are small walls with the same pad and drainage. Caps are glued with exterior concrete adhesive after the wall is complete and clean. Cut block with a wet masonry saw or a splitter, under OSHA's silica rules. Swelling clays and frost add pressure the manufacturer's gravity chart never assumed, which is why a 3-foot wall in heavy clay can still be an engineer's wall.

Advanced / Pro-Level

Pros understand that the engineer checks four things: sliding, overturning, bearing, and global stability of the whole slope, and that a perfect wall can still fail if the slope under it moves. They look for the utility that runs through the reinforced zone before the grid is ordered, because you cannot trench through grid later. They design tiered walls and terraces as a system and refuse to build the upper tier without the engineer's say. On big commercial walls they expect special inspection and a geotechnical report. On every wall they put the outlet, the swale, and the no-irrigation zone on the as-built.

Practice Challenge

A customer wants a 3-foot-6-inch wall to hold up a new parking pad for a truck, with a 2:1 slope rising above the pad, and the salesperson says no permit is needed because it is under 4 feet. What is wrong? (Answer: the pad and the truck are a surcharge and the slope above is another, so the wall is not exempt even under 4 feet; it needs an engineered design with geogrid, a permit, and inspections, and the drainage and reinforced zone must be checked against anything buried in the slope.)

In Practice

A crew that levels every unit in the first course, keeps 12 inches of clean stone and a pipe behind the wall, lays grid the right way and the right length, and hand-compacts the 3 feet behind the block builds walls that look the same in year fifteen. A crew that sets block on dirt, backfills with the excavated clay, and rolls grid the wrong direction builds a wall that bellies out the first wet spring and then becomes a lawsuit.

Common Mistakes to Avoid

Takeaway: A segmental wall is a soil structure — the leveling pad, the buried course, the drainage, the geogrid, and the compacted backfill do the work, and any wall that is tall, tiered, or carrying a surcharge is an engineer's wall, not a crew's guess.

Educational content only — not design, engineering, or hands-on instruction, and not a substitute for training under a qualified landscape or hardscape professional or the judgment of a licensed engineer, landscape architect, or plumber. Follow the IRC/IBC, plumbing, and stormwater codes as adopted in your jurisdiction, the project drawings and specifications, CMHA (ICPI/NCMA) installation guidelines, the manufacturer's instructions, OSHA 29 CFR 1926, and your employer's procedures.