Welcome

Hello, and welcome. This is Super Structures General Contractors — a national general contractor headquartered in Powhatan, Virginia — here to help you and your clients build something that lasts. We're glad you're with us, and we look forward to connecting with you.

Electric vehicle charging has become one of the most common calls a solar or electrical contractor gets. On the surface it's simple — run a circuit, hang a charger. In reality, a charger is one of the largest continuous loads in a house, and a row of them can reshape a commercial building's electrical service. This lesson walks through the levels, the Code, and the load math.

Educational overview only — not electrical, mechanical, structural, or drilling design, a safety program, or a substitute for work under licensed electricians, mechanical contractors, well drillers, and engineers. Follow the NEC as adopted by your authority having jurisdiction (AHJ), the building, mechanical, plumbing, and fire codes, OSHA, state water and well regulations, the manufacturers' instructions, and your utility's rules. Code editions change and jurisdictions adopt different ones — always check the edition your AHJ enforces.

Charging Levels

The equipment is called EVSE (electric vehicle supply equipment). Use equipment listed for the purpose.

NEC Article 625 Essentials

NEC Article 625 covers EV power transfer equipment. Key ideas (check the edition your AHJ enforces):

Location matters too: protection from vehicle damage (bollards or wheel stops), cord management, and mounting height per the manufacturer.

Residential Load Calculations

Before adding a 40–60 A circuit, confirm the service can carry it. Use an Article 220 load calculation — the standard or optional method — or, where the Code allows, a year of utility demand data. Recent editions include a specific EVSE load value in Article 220 (the larger of a fixed wattage or the nameplate rating). Many older homes with 100 A services, electric ranges, dryers, and heat pumps don't have room for a full-size charger.

Load Management Options

When the service is tight, you have options short of a service upgrade:

Commercial Charging

Commercial projects add layers:

Federal and state funding programs for public charging have changed significantly — verify current program status before building a business plan around them.

Going Deeper (Intermediate)

Run a voltage drop check on long garage or parking-lot runs, verify the EVSE's wiring for 208 V versus 240 V (power drops at 208 V), and confirm the terminal temperature rating for conductor sizing. Outdoor installs need wet-location-rated equipment and fittings. On a home with solar, coordinate the panel: a big EV breaker plus a PV backfed breaker can collide with the 705.12 busbar rules.

Advanced / Pro-Level

Pros design parking lots for the future: oversized conduit and spare transformer capacity cost little during construction and a lot later. They model fleet charging schedules against utility rate structures, pair DCFC with battery storage to shave demand peaks, and write commissioning procedures that include network activation and load-management testing. For fleet depots, the electrical service can rival a small industrial plant — plan it with the utility from day one.

Practice Challenge

A customer with a 200 A service, electric range, dryer, heat pump, and a 7 kW solar system wants a 48 A charger. What's your process? (Answer: run an Article 220 load calculation, or use a year of demand data where allowed, including the EVSE. If it fits, install a 60 A circuit with conductors sized for the 125% continuous rule. If it doesn't, offer a lower charger setting or an energy management system before a service upgrade — and check the panel's busbar against the existing PV backfeed under 705.12.)

In Practice

The best EV installers do a quick load check on the first call, photograph the panel and the route, and quote options — full-power with an upgrade, or managed charging without one.

Common Mistakes to Avoid

Takeaway: EV charging is a continuous load under NEC 625 — size it at 125 percent, prove the service can carry it, and use load management when it can't.