Carpentry Field Practice: Layout, Framing Details, Finish & Inspection
The second carpentry course: laying out from the plans and building the cut list, the floor, wall, and roof details that keep the load path continuous, installing engineered lumber, trusses, and hardware to the literature, sheathing, wall bracing, and the water and air barrier, finish carpentry to tolerance, and the blocking, fire blocking, and framing-inspection walk that commercial and residential work both depend on.
Lessons
- Layout From the Plans: Control Lines, Plate Layout & the Cut List8 min
- Floor, Wall & Roof Framing Details That Carry the Load Path9 min
- Engineered Lumber, Trusses & Structural Hardware: Installing to the Literature9 min
- Sheathing, Wall Bracing & the Water and Air Barrier9 min
- Interior Finish Carpentry: Doors, Trim, Stairs & Working to Tolerance9 min
- Commercial Rough Carpentry, Blocking & Passing the Framing Inspection10 min